Heating and Cooling supply vents are almost never installed right

Jan 21, 2016

Heating and Cooling supply vents

Heating and cooling supply vents are almost never installed right which is costing you money. The vent should be sealed off during construction to prevent debris from falling into the opening, but also for job site safety. This will prevent blockages in the duct from various debris to block air flow. It is common to find screws, wood, and drywall in duct work.

IMG_3463

The vent should also be tied tight to the subfloor using mastic. This reduces the amount of air that will hit the bottom of the register and flow back down into the room above or below. This allows the air flow to get to the room it is intended to reach. In the average house 30% of the air leaks out of the duct work before it reaches the room it is intended to heat or cool. In a tight well designed duct system only 10% of the air leaks out of ducts.

IMG_0731

Using hard duct as opposed to flex duct is another important strategy to getting the air to the room it is intended to heat or cool. If flex duct is required then limiting the bends in the design is important.

Related Posts

Today we give thanks for Community, Craftsmanship, Design, and a Better Future for All

Today we give thanks for Community, Craftsmanship, Design, and a Better Future for All

I (we) am fortunate to have a cohesive team of highly skilled designers that understand empathy and service are ...
Legacy Estate Home Design

Legacy Estate Home Design

The most important step in the design process is sitting down with people to listen to how they want to live and ...
Thinking of Building a Luxury Home in Central Virginia? (Part 5 of 5)

Thinking of Building a Luxury Home in Central Virginia? (Part 5 of 5)

Phase 4, known as construction administration, starts with dirt moving as construction begins. We stay available ...
Thinking of Building a Luxury Home in Central Virginia? (Part 4 of 5)

Thinking of Building a Luxury Home in Central Virginia? (Part 4 of 5)

Phase 3 (2 or more months), also known as construction documents phase, takes all the decisions and testing we ...
No results found.

Discover more from The Gaines Group Architects

Subscribe now to keep reading and get access to the full archive.

Continue reading