Green Term Defined: Renovation

Mar 23, 2015

Green Term Defined: Renovation

20140929_152629_1

We know a lot about how to build a new building that is very energy-efficient, healthy, and durable. However, no matter how good we can build new structures, saving an existing building is almost always better for the environment. Unless the existing structural system is beyond repair or the existing building contains toxic elements.

DSC08432

Renovation is the act of repurposing / updating / remodeling of a building.

Mt Crawford Basement Renovation

 

There is no question, it is easier to build a new building to the highest standards than it is to take an old building to the same standard. However, the embodied energy is much lower when renovating a building vs building new. A National Trust study found it can take more than 10 years for a new energy-efficient building to overcome the negative climate change impacts caused during the construction process. There is a tremendous amount of energy in the existing building from footings, foundations, materials, energy to create new materials, transportation of those materials and on and on not to mention energy to demolish the existing building.

102407FINAL 072

Related Posts

Today we give thanks for Community, Craftsmanship, Design, and a Better Future for All

Today we give thanks for Community, Craftsmanship, Design, and a Better Future for All

I (we) am fortunate to have a cohesive team of highly skilled designers that understand empathy and service are ...
Legacy Estate Home Design

Legacy Estate Home Design

The most important step in the design process is sitting down with people to listen to how they want to live and ...
Thinking of Building a Luxury Home in Central Virginia? (Part 5 of 5)

Thinking of Building a Luxury Home in Central Virginia? (Part 5 of 5)

Phase 4, known as construction administration, starts with dirt moving as construction begins. We stay available ...
Thinking of Building a Luxury Home in Central Virginia? (Part 4 of 5)

Thinking of Building a Luxury Home in Central Virginia? (Part 4 of 5)

Phase 3 (2 or more months), also known as construction documents phase, takes all the decisions and testing we ...
No results found.

Discover more from The Gaines Group Architects

Subscribe now to keep reading and get access to the full archive.

Continue reading