Green Term Defined: Thermal Bridging

Aug 24, 2015

Green Term Defined: Thermal Bridging

Missing-Insualtion-2

Thermal bridging is one of the biggest problems we have when trying to create a high performance home. It is imperative to find an economical solution for walls that eliminates any thermal bridging from inside to outside the home. Thermal Bridging is where heat occurs across more conductive components in an otherwise well-insulated material, resulting in disproportionately significant heat loss.

encapsulated crawl

Thermal Bridging can occur when using wood studs, steel studs, pre-engineered metal building, Insulated Concrete Forms, and even SIPS. In 2012 the building code in Virginia recognized this as an issue for code minimum buildings adding new requirements. To build the least energy-efficient possible building (code minimum) you have to either add additional insulation in your walls or wrap your building in a insulation blanket such as rigid board insulation. The minimum attic insulation has also increased dramatically over the last several years to meet code minimum. There are many places where bridging happens in a home including door and window frames, studs, attic access panel, trusses, nails, and even foundation walls can have issues. There are products that perform better to eliminate these challenges, but it sometimes takes a different way than builders are used to doing construction details.

HouseWrap

There are challenges with adding more insulation, from diminishing returns to vapor movement. A keen understanding of building science is needed to deliver the best possible solution for health, durability, energy-efficiency, and budget. The biggest challenge I encounter are builders that have always done it another way and don’t want to change for fear of it not working.

Related Posts

Legacy Estate Home Design

Legacy Estate Home Design

The most important step in the design process is sitting down with people to listen to how they want to live and ...
Thinking of Building a Luxury Home in Central Virginia? (Part 5 of 5)

Thinking of Building a Luxury Home in Central Virginia? (Part 5 of 5)

Phase 4, known as construction administration, starts with dirt moving as construction begins. We stay available ...
Thinking of Building a Luxury Home in Central Virginia? (Part 4 of 5)

Thinking of Building a Luxury Home in Central Virginia? (Part 4 of 5)

Phase 3 (2 or more months), also known as construction documents phase, takes all the decisions and testing we ...
Thinking of Building a Luxury Home in Central Virginia? (Part 3 of 5)

Thinking of Building a Luxury Home in Central Virginia? (Part 3 of 5)

Phase 2 (2 or more months), also known as design development, takes these high-level concepts and starts creating ...