The Harrisonburg office building being renovated in downtown has moved into the next stage of construction. Holes are cut in the roof, stair towers are rising through the existing shell, and the elevator shaft will soon be evident from the street. The second floor will soon be in place. Let us know what you think so far. Phase 1 Demolition see here.
Social Share
6 Comments
Hi Charles â are those metal wall panels cladding the second story?
Lee Ann M. Slattery, CSI, CCPR, LEED AP BD+C
Sales Support Manager at ATAS International, Inc.
President-Elect of CSI Allentown Chapter
6612 Snowdrift Road
Allentown, PA 18106
P: 610-395-8446, ext. 241
C: 610-349-1936
[cid:image001.jpg@01CF69D4.E1B06210]
Please consider the environment before printing this e-mail.
Disclaimer: This communication, together with any attachments hereto or links contained herein, is for the use of the intended recipient(s) and may contain information that is confidential or legally protected. If you are not the intended recipient, you are hereby notified that any review, disclosure, copying, dissemination, distribution or use of this communication is STRICTLY PROHIBITED. If you have received this communication in error, please notify the sender immediately by return e-mail message and delete the original and all copies of the communication, along with any attachments hereto or links herein, from your system. Thank you, for your cooperation.
Yes, we are using ATAS Design Wall Panel on this job. It gives a nice clean look, while providing some interest to the facade.
Pingback: Harrisonburg Downtown Office – Updated | DESIGN MATTERS
Pingback: Harrisonburg-Rockingham Child and Family Services building has a second floor! | DESIGN MATTERS
Pingback: Downtown office building renovation update | DESIGN MATTERS
Pingback: renovated downtown office in Harrisonburg almost done | DESIGN MATTERS