Harrisonburg’s Speech and Language Center Construction Finishing Up
Here is an update on Harrisonburg’s Speech and Language Center. For past posts, check them out HERE, HERE, and HERE. The exterior finishes are looking sharp and have been a drastic change from the original.
There is a small storage area on the second floor including a loft space.
The vibrant colors add life to the building.
The large windows bring in lots of natural light.
This project had a very tight site line for the addition. We expanded the existing structure as much as parking and site set backs would allow.